SERVICES & PLANNING REQUIREMENTS "*" indicates required fields Address* Street Address Suburb State PowerPower available at property* Yes No N/A Available phase / amps* Power available for the construction period* Yes No N/A Heating requirements* Cooking requirements* Hot water requirements* WaterWater available at the property* Town Tank N/A Water not available at property* Yes No N/A Water tapping required* Yes No N/A Water tapping road bore required* Yes No Unsure N/A SewageSewage connection to local authority Point of Discharge* Yes No N/A Sewage connection within property boundary* Yes No N/A Septic tank install by owner* Yes No N/A Land Capability Assessment* By Builder Owner N/A Power Connection to septic pump by builder via variation* Yes No N/A Please note: Connection of septic to drain & permit to be obtained by the owner / othersOtherBushfire Management Overlay* Yes No N/A Bushfire Assessment Level*BAL LOWBAL 12.5BAL 19BAL 29BAL 40BAL FZN/ATermite Treatment Zone* Yes No N/A Driveway access with heavy vehicle capabilty by owner* Yes No N/A Crossover by owner* Yes No N/A Planning Permit required* Yes No N/A House SitingWithin Building Envelope* Yes No N/A Property in a Flood Zone* Yes No N/A Subject to Catchment Authority, Australian Height Datum (AHD levels)* Yes No N/A NameThis field is for validation purposes and should be left unchanged.