Skip to content

SERVICES & PLANNING REQUIREMENTS

"*" indicates required fields

Address*

Power

Power available at property*
Power available for the construction period*

Water

Water available at the property*
Water not available at property*
Water tapping required*
Water tapping road bore required*

Sewage

Sewage connection to local authority Point of Discharge*
Sewage connection within property boundary*
Septic tank install by owner*
Land Capability Assessment*
Power Connection to septic pump by builder via variation*

Please note: Connection of septic to drain & permit to be obtained by the owner / others

Other

Bushfire Management Overlay*
Termite Treatment Zone*
Driveway access with heavy vehicle capabilty by owner*
Crossover by owner*
Planning Permit required*

House Siting

Within Building Envelope*
Property in a Flood Zone*
Subject to Catchment Authority, Australian Height Datum (AHD levels)*
This field is for validation purposes and should be left unchanged.
Back To Top